APPLICATION OF UNDERBOLD-POD30

Higher compressive strength than with a conventional road construction method!

Compared to conventional stabilisation, the use of UNDERBOLD-POD30 does not require any special or additional equipment or systems.

The optimum mixing ratio of the additive with the cement and the mineral mixture (soil or rock) is determined using the soil parameters to be tested and adapted to the client's specifications.

Sampling and control tests to verify the optimum quality success are orientated towards the application and the client's specifications.

UNDERBOLD-POD30 has convincingly demonstrated its properties in use in many countries.

Brief description of the UNDERBOLD-POD30 workflow

(Details can be found in our brochure "Processing recommendations", which you can request from us)

PREPARATION

Levelling of the surface, removal of the organic top layer, Preliminary profiling.

 

 

MIXING IN

Mixing in the Underbold POD30 water mixture.
Preliminary profiling.

 

 

INTERMEDIATE COMPACTION

To restore the original level
+ Intermediate compacting

 

SPREAD BINDING AGENT

Spread the binding agent over the surface,
avoiding dust formation as far as possible.

Milling in binding agents

Alternatively with or without water

LEVELLING + FINAL COMPACTION

Achieving the final level and optimum compaction of the mixture